Indigenous Hydrogen Fuel Cell Train MCQ - Practice Questions with Answers
Solve 51 Indigenous Hydrogen Fuel Cell Train questions for RAS/RPSC preparation.
Practice questions
Q1Assertion: The required licence for the Jind hydrogen train site was granted by the Petroleum and Explosives Safety Organisation. Reason: The licence related to storage and dispensing of compressed hydrogen gas at the Jind site. Choose the correct answer.
The Assertion is true because the Petroleum and Explosives Safety Organisation granted the required licence. The Reason is also true because the licence was for storage and dispensing of compressed hydrogen gas at the Jind site; it correctly states the scope of that licence. Claims that either statement is false do not match the cited fact.
Q2For the approved indigenous hydrogen fuel cell trainset, which matching correctly identifies the planned section and railway zone?
The cited fact places the approved trainset on the Jind-Sonipat section of Northern Railway. Pairing Jind-Sonipat with Western Railway keeps the section but changes the zone, Rewari-Rohtak changes the section, and Sonipat-Panipat with North Western Railway changes both the section and the zone.
Q3Assertion: RDSO prepared the technical specification for the Development of Hydrogen Fuel Cell based DPRS 1600 HP DEMU, known as the Hydrogen Train Set. Reason: IROAF, not RDSO, prepared that technical specification. Choose the correct answer.
The Assertion is true because RDSO prepared the technical specification for the Hydrogen Fuel Cell based DPRS 1600 HP DEMU, known as the Hydrogen Train Set. The Reason is false because it shifts that work to IROAF; treating both statements as true, or treating the Assertion as false, conflicts with the cited Year Book fact.
Q4On 7 August 2021, which Indian Railways organisation invited bids for a hydrogen fuel cell-based train on the Indian Railways network?
The cited PIB release says that the Indian Railways Organisation of Alternative Fuels invited bids on 7 August 2021 for a hydrogen fuel cell-based train on the Indian Railways network. Research Designs and Standards Organisation is a standards and research body, Rail India Technical and Economic Service is a consultancy enterprise, and Integral Coach Factory is a coach-manufacturing unit; none of these is the organisation named in the cited bid invitation.
Q5Assertion: The hydrogen plant conceived at Jind is linked to green hydrogen generation. Reason: The plant produces hydrogen through electrolysis. Choose the correct answer.
The Assertion is true because the Jind plant is described as a green hydrogen generation element. The Reason is also true because the cited fact says the plant produces hydrogen through electrolysis, and electrolysis is the stated key element linking it to green hydrogen generation. Denying the Reason or breaking the explanatory link misreads the sourced fact.
You've seen 5 of 51 sample questions
Unlimited practice on Indigenous Hydrogen Fuel Cell Train comes with the RAS Test Series + Practice pack or Gate Pass.
More questions
6Which sequence correctly gives the two scheduled pre-bid conference dates for the 2021 hydrogen train tender?
7For the Jind refuelling system of the hydrogen train, which sequence best represents the operational arrangement implied by the cited initiative?
8Match the infrastructure item with its stated role in the indigenous hydrogen train initiative: Item: Hydrogen compression system at Jind Role: ?
9Consider the following Assertion and Reason about the 2021 hydrogen fuel cell train project: Assertion: The current-year allocation for the project was Rs. 8 crore. Reason: The project entry specified Rs. 8 crore as the current-year allocation. Select the correct answer.
10As per the RDSO Annual Report 2020-21, match the hydrogen fuel cell hybrid power train project with the route on which it was recorded.
11Which sequence best captures the RDSO-recorded process for optimising hydrogen power train components in the cited 2020-21 report?
12Consider the following statements about the first hydrogen train pilot taken up by Indian Railways: 1. The pilot was taken up by Indian Railways. 2. The specifications for the pilot were framed by the Research, Design & Standards Organization. 3. The specifications were framed by the Bureau of Energy Efficiency. Which of the statements given above are correct?
13In the 2021 project scope for the hydrogen fuel cell based train on the Indian Railways network, which on-site facility was included at the project site?
14With reference to the 2021 hydrogen train tender timeline, consider the following statements: 1. Submission of offers was scheduled to start on 21 September 2021. 2. Tender opening was scheduled for 5 October 2021. 3. Tender opening was scheduled before the start of offer submission. Which of the statements given above is/are correct?
15Match the elements of the initial 2021 hydrogen fuel cell train bid with the correct particulars. List I 1. Route section 2. Section length 3. Railway zone List II a. 89 km b. Northern Railway c. Sonipat-Jind Select the correct code.