Indigenous Hydrogen Fuel Cell Train MCQ - Practice Questions with Answers

Solve 51 Indigenous Hydrogen Fuel Cell Train questions for RAS/RPSC preparation.

Practice questions

Q1Assertion: The required licence for the Jind hydrogen train site was granted by the Petroleum and Explosives Safety Organisation. Reason: The licence related to storage and dispensing of compressed hydrogen gas at the Jind site. Choose the correct answer.

A The Assertion is true, but the Reason is false
B Both the Assertion and the Reason are true, and the Reason correctly identifies the scope of the licence
C Both the Assertion and the Reason are false
D The Assertion is false, but the Reason is true
Explanation

The Assertion is true because the Petroleum and Explosives Safety Organisation granted the required licence. The Reason is also true because the licence was for storage and dispensing of compressed hydrogen gas at the Jind site; it correctly states the scope of that licence. Claims that either statement is false do not match the cited fact.

Q2For the approved indigenous hydrogen fuel cell trainset, which matching correctly identifies the planned section and railway zone?

A Jind-Sonipat section — Western Railway
B Jind-Sonipat section — Northern Railway
C Sonipat-Panipat section — North Western Railway
D Rewari-Rohtak section — Northern Railway
Explanation

The cited fact places the approved trainset on the Jind-Sonipat section of Northern Railway. Pairing Jind-Sonipat with Western Railway keeps the section but changes the zone, Rewari-Rohtak changes the section, and Sonipat-Panipat with North Western Railway changes both the section and the zone.

Q3Assertion: RDSO prepared the technical specification for the Development of Hydrogen Fuel Cell based DPRS 1600 HP DEMU, known as the Hydrogen Train Set. Reason: IROAF, not RDSO, prepared that technical specification. Choose the correct answer.

A Both the Assertion and the Reason are true, but the Reason does not explain the Assertion
B The Assertion is true, but the Reason is false
C Both the Assertion and the Reason are true, and the Reason correctly explains the Assertion
D The Assertion is false, but the Reason is true
Explanation

The Assertion is true because RDSO prepared the technical specification for the Hydrogen Fuel Cell based DPRS 1600 HP DEMU, known as the Hydrogen Train Set. The Reason is false because it shifts that work to IROAF; treating both statements as true, or treating the Assertion as false, conflicts with the cited Year Book fact.

Q4On 7 August 2021, which Indian Railways organisation invited bids for a hydrogen fuel cell-based train on the Indian Railways network?

A Rail India Technical and Economic Service
B Integral Coach Factory
C Indian Railways Organisation of Alternative Fuels
D Research Designs and Standards Organisation
Explanation

The cited PIB release says that the Indian Railways Organisation of Alternative Fuels invited bids on 7 August 2021 for a hydrogen fuel cell-based train on the Indian Railways network. Research Designs and Standards Organisation is a standards and research body, Rail India Technical and Economic Service is a consultancy enterprise, and Integral Coach Factory is a coach-manufacturing unit; none of these is the organisation named in the cited bid invitation.

Q5Assertion: The hydrogen plant conceived at Jind is linked to green hydrogen generation. Reason: The plant produces hydrogen through electrolysis. Choose the correct answer.

A Both the Assertion and the Reason are true, but the Reason does not explain the Assertion
B The Assertion is false, but the Reason is true
C Both the Assertion and the Reason are true, and the Reason correctly explains the Assertion
D The Assertion is true, but the Reason is false
Explanation

The Assertion is true because the Jind plant is described as a green hydrogen generation element. The Reason is also true because the cited fact says the plant produces hydrogen through electrolysis, and electrolysis is the stated key element linking it to green hydrogen generation. Denying the Reason or breaking the explanatory link misreads the sourced fact.

You've seen 5 of 51 sample questions

Unlimited practice on Indigenous Hydrogen Fuel Cell Train comes with the RAS Test Series + Practice pack or Gate Pass.

More questions

6Which sequence correctly gives the two scheduled pre-bid conference dates for the 2021 hydrogen train tender?

A21 September 2021, then 5 October 2021
B17 August 2021, then 9 September 2021
C17 September 2021, then 9 October 2021
D9 August 2021, then 17 September 2021

7For the Jind refuelling system of the hydrogen train, which sequence best represents the operational arrangement implied by the cited initiative?

AStandby compressor unit first, then no dedicated refuelling system at Jind
BJind refuelling system, with Indian Railways ensuring a standby compressor unit
CStorage licence first, with no compressor backup planned
DManual hydrogen dispensing first, then replacement by a storage licence

8Match the infrastructure item with its stated role in the indigenous hydrogen train initiative: Item: Hydrogen compression system at Jind Role: ?

AFor signalling backup at the Jind station
BFor onboard traction power conversion of the train
CFor passenger-coach air-conditioning support
DFor refuelling operations of the hydrogen train

9Consider the following Assertion and Reason about the 2021 hydrogen fuel cell train project: Assertion: The current-year allocation for the project was Rs. 8 crore. Reason: The project entry specified Rs. 8 crore as the current-year allocation. Select the correct answer.

AThe Assertion is true, but the Reason is false
BBoth the Assertion and the Reason are true, but the Reason does not correctly explain the Assertion
CBoth the Assertion and the Reason are true, and the Reason correctly explains the Assertion
DThe Assertion is false, but the Reason is true

10As per the RDSO Annual Report 2020-21, match the hydrogen fuel cell hybrid power train project with the route on which it was recorded.

A1200 kW broad gauge DEMU — Delhi-Ambala; 700 HP ZDM3 locomotive — Sonepat-Jind
B1200 kW broad gauge DEMU — Sonepat-Jind; 700 HP ZDM3 locomotive — Kalka-Shimla
C1200 kW broad gauge DEMU — Kalka-Shimla; 700 HP ZDM3 locomotive — Kangra Valley
D1200 kW broad gauge DEMU — Kalka-Shimla; 700 HP ZDM3 locomotive — Sonepat-Jind

11Which sequence best captures the RDSO-recorded process for optimising hydrogen power train components in the cited 2020-21 report?

AOptimise the components first, then record drive cycles on the 1200 kW DEMU and 700 HP ZDM3 locomotive
BRecord drive cycles only for the 1200 kW Sonepat-Jind DEMU, then optimise components for all locomotives
CRecord drive cycles for the 1200 kW Sonepat-Jind DEMU and the 700 HP Kalka-Shimla ZDM3 locomotive, then optimise hydrogen power train components
DCertify zero-emission operation first, then record passenger-service data on Kalka-Shimla only

12Consider the following statements about the first hydrogen train pilot taken up by Indian Railways: 1. The pilot was taken up by Indian Railways. 2. The specifications for the pilot were framed by the Research, Design & Standards Organization. 3. The specifications were framed by the Bureau of Energy Efficiency. Which of the statements given above are correct?

A2 and 3 only
B1 only
C1, 2 and 3
D1 and 2 only

13In the 2021 project scope for the hydrogen fuel cell based train on the Indian Railways network, which on-site facility was included at the project site?

AA stationary on-ground hydrogen storage and filling station
BA solar-powered traction substation only
CA mobile hydrogen tanker fleet only
DA lithium-ion battery recycling plant

14With reference to the 2021 hydrogen train tender timeline, consider the following statements: 1. Submission of offers was scheduled to start on 21 September 2021. 2. Tender opening was scheduled for 5 October 2021. 3. Tender opening was scheduled before the start of offer submission. Which of the statements given above is/are correct?

A1 only
B1 and 3 only
C2 only
D1 and 2 only

15Match the elements of the initial 2021 hydrogen fuel cell train bid with the correct particulars. List I 1. Route section 2. Section length 3. Railway zone List II a. 89 km b. Northern Railway c. Sonipat-Jind Select the correct code.

A1-a, 2-b, 3-c
B1-b, 2-c, 3-a
C1-c, 2-a, 3-b
D1-c, 2-b, 3-a