MCQ
ISRO Lunar Missions MCQ - Practice Questions with Answers
Solve 52 ISRO Lunar Missions questions for RAS/RPSC preparation.
Practice questions
Q1Which sequence correctly reflects the Chandrayaan-2 Vikram landing attempt described by ISRO?
ISRO describes Vikram's Chandrayaan-2 landing attempt as taking place on September 7, 2019, with communication lost after descent from 35 km to around 2 km above the lunar surface. Starting with communication loss reverses the sequence, September 2 is the lander-separation date rather than the landing attempt date, and swapping 2 km and 35 km reverses the stated altitude details.
Q2In the 2003 calendar sequence, where does the Government of India's approval of ISRO's proposal for Chandrayaan-1 fall?
The approval falls in November 2003 because the sourced PSLV-C11/Chandrayaan-1 fact says the Government of India approved ISRO's proposal for the first Indian Moon Mission, Chandrayaan-1, in November 2003. Placing it before September 2003, in October 2003, or after December 2003 changes the month given in the cited fact.
Q3Which sequence correctly reflects the sourced conclusion detail of Chandrayaan-1?
The sourced fact states that Chandrayaan-1 made more than 3400 orbits around the Moon before the mission was concluded. Placing the mission conclusion before those orbits reverses the stated order. Saying exactly 3400 or more than 34000 orbits changes the sourced figure.
Q4With reference to Chandrayaan-1's SARA payload, consider the following statements: 1. It imaged the lunar surface using low-energy neutral atoms. 2. Its relevant energy range was 10 eV to 3.2 keV. 3. It used hard X-rays in the 30 keV to 270 keV region. Which of the statements given above are correct?
Statement 1 is correct because SARA imaged the lunar surface using low-energy neutral atoms. Statement 2 is correct because the cited energy range was 10 eV to 3.2 keV. Statement 3 is wrong because 30 keV to 270 keV is the hard X-ray region of the High Energy X-ray Spectrometer, not SARA's low-energy neutral atom range.
Q5Match the Chandrayaan-1 payload detail with the correct sourced description: List I 1. Number of scientific instruments 2. Countries where instruments were built List II a. 11 b. India, USA, UK, Germany, Sweden and Bulgaria c. 8 d. India, Russia, France, Japan, Germany and Sweden Select the correct match.
The correct pairing is 11 scientific instruments and the set of countries India, USA, UK, Germany, Sweden and Bulgaria. The figure 8 is not the sourced instrument count, and the country set including Russia, France and Japan does not match the cited Chandrayaan-1 payload description.
You've seen 5 of 52 sample questions
Unlimited practice on ISRO Lunar Missions comes with the RAS Test Series + Practice pack or Gate Pass.
More questions
6On which date did the Chandrayaan-3 Lander Module separate from the Propulsion Module?
7Which set correctly matches the objective components of Chandrayaan-1's Mini-SAR?
8According to ISRO's account of the making of Chandrayaan-3, which set correctly represents major ISRO units involved in the mission?
9With reference to the Indian Deep Space Network developed before Chandrayaan-1's launch, consider the following statements: 1. It was developed at Byalalu. 2. Its antenna system included 32 m and 18 m diameter antennas. 3. It was developed after the Moon Impact Probe completed its lunar impact. Which of the statements given above are correct?
10Which of the following was one of the stated objectives of Chandrayaan-1?
11With reference to Chandrayaan-2's Dual Frequency Radio Science experiment, consider the following statements: 1. It transmitted simultaneous X-band at 8496 MHz. 2. It transmitted simultaneous S-band at 2240 MHz. 3. Its stated purpose was to study the lunar ionosphere. Which of the statements given above are correct?
12Which set correctly gives Chandrayaan-3's stated power generation for the Propulsion Module, Lander Module and Rover respectively?
13For Chandrayaan-2's Terrain Mapping Camera-2, arrange the following specification elements in the order in which they form the complete ISRO description: sensor band, spatial resolution, swath, and reference lunar orbit.
14Consider the following Assertion and Reason about Chandrayaan-3: Assertion: The designed mission life of both the lander and the rover was one lunar day. Reason: One lunar day was taken as approximately 28 Earth days for this mission. Choose the correct answer.
15Consider the following statements about the CLASS payload of Chandrayaan-2: 1. It measures lunar X-ray fluorescence spectra. 2. It helps detect elements such as Mg, Al, Si, Ca, Ti, Fe and Na. 3. It is described as measuring reflected solar radiation over 0.8-5.0 um. Which of the statements given above are correct?
