MCQ
upsc-p1-economy-infrastructure-ppp MCQ - Practice Questions with Answers
Solve 1 upsc-p1-economy-infrastructure-ppp questions for RAS/RPSC preparation.
Practice questions
Q1With reference to renewable-energy infrastructure, consider the following statements: 1. Installed renewable capacity is identical to firm round-the-clock electricity supply. 2. Integrating renewables requires forecasting, storage and interstate transmission. 3. A renewable park without evacuation lines can become stranded capacity. Which of the statements given above are correct? Select the correct answer using the code given below.
Statements 2 and 3 are correct. Variable renewable generation requires forecasting, storage and transmission support, and capacity without evacuation infrastructure may remain stranded. Statement 1 is incorrect because installed capacity measures potential scale, not assured round-the-clock supply.
You've seen 1 of 1 sample questions
Unlimited practice on upsc-p1-economy-infrastructure-ppp comes with the RAS Test Series + Practice pack or Gate Pass.
