Q1What primary equipment was used to launch the portal beams over Indian railway tracks?

A Hydraulic strand jack system
B Rail-mounted gantry
C Launching girder
D 2200-tonne crawler crane
Explanation

The release says a 2200-tonne crawler crane was used as the primary equipment and that this was the first such use over Indian railway tracks. The other equipment types are plausible construction tools but are not reported for this operation.