Q1Assertion (A): Work on the Ujh Multipurpose Project will begin without waiting for the entire land-acquisition process to be completed. Reason (R): The project is expected to provide irrigation water to nearly 90,000 hectares across four districts in Jammu and Kashmir and Punjab. Select the correct answer using the code below.
Both the assertion and the reason are true. However, the irrigation coverage does not explain the decision to start work while the remaining land is still being acquired. Therefore, option B is correct.
Q2Consider the following statements about the Ujh Multipurpose Project: 1. It is planned on the Ujh River, a main tributary of the Ravi, and is designed to generate about 186 MW to 212 MW of electricity. 2. Its expected irrigation coverage is confined to Kathua and Samba districts of Jammu and Kashmir. Which of the statements given above is/are correct?
Statement 1 is correct. The project is planned on the Ujh, a main tributary of the Ravi, with a design range of about 186 MW to 212 MW. Statement 2 is incorrect because expected irrigation coverage also includes Pathankot and Gurdaspur districts in Punjab.