Q1As per the PIB clarification of 14 August 2026, the Ken–Betwa Link Project will ensure irrigation for how much area?
The PIB release states that the Ken–Betwa Link Project will ensure irrigation for 10.62 lakh hectares, along with drinking water for nearly 62 lakh people and 103 MW of hydropower.
Q2Consider the following statements regarding the Ken–Betwa Link Project as clarified by PIB on 14 August 2026: 1. The project aims to transfer surplus water from the Betwa River to the Ken River. 2. Of the total estimated cost of ₹44,604.99 crore, more than ₹30,000 crore had been spent up to July 2026. Which of the statements given above is/are correct?
Both statements are incorrect. The project transfers surplus water from the Ken River to the Betwa River, and spending up to July 2026 was ₹12,445.85 crore—not more than ₹30,000 crore.