Q1Consider the following statements about railway-station development in Rajasthan under the Amrit Bharat Station Scheme: 1. Development work has been completed at 18 of the 85 stations covered by the scheme. 2. The 12-metre-wide foot overbridge and lift at Falna have been completed. Which of the statements given above is/are correct?
Statement 1 is correct: 85 Rajasthan stations are covered and work at 18 has been completed. Statement 2 is incorrect because Falna's 12-metre-wide foot overbridge and lift are still under construction. Therefore, option A is correct.