Q1Consider the following Assertion and Reason about Rajasthan's expressway planning. Assertion: Rajasthan constituted a task force on 5 February 2024 to make the state an expressway capital of India. Reason: The plan mentioned in the Economic Review was limited to five brownfield expressways. Select the correct answer.

A The Assertion is true, but the Reason is false
B The Assertion is false, but the Reason is true
C Both the Assertion and the Reason are true, and the Reason correctly explains the Assertion
D Both the Assertion and the Reason are true, but the Reason does not correctly explain the Assertion
Explanation

The Assertion is true: Rajasthan constituted a task force on 5 February 2024 to make the state an expressway capital of India. The Reason is false because the Economic Review mentions plans for nine greenfield expressways, not five brownfield expressways. Therefore, responses treating both statements as true misread the expressway count and type, while rejecting the Assertion ignores the stated task-force date and objective.

Q2In Rajasthan's Budget 2024-25, what was announced for six surface-water-based mega drinking water projects?

A About Rs. 5,123.06 crore to cover 183 urban local bodies
B About Rs. 20,370 crore to supply 5,846 additional villages
C Rs. 39,362.64 crore to cover 107 towns and 16,680 villages
D Rs. 93,427 crore for 11,159 single village schemes
Explanation

The Budget 2024-25 announcement was about Rs. 20,370 crore for six surface-water-based mega drinking water projects meant to supply 5,846 additional villages. The 183 urban local bodies figure belongs to AMRUT 2.0 water-supply works, the Rs. 39,362.64 crore figure belongs to the wider set of 120 major drinking-water projects, and Rs. 93,427 crore relates to Jal Jeevan Mission sanctions.

Q3Match the Rajasthan rural roads scheme figures for 2024-25 with the correct value: List I 1. Budget provision 2. Physical target 3. Completed up to December 2024 List II a. Rs. 4,000 crore b. 13,796 km c. 5,606 km Select the correct code.

A 1-a, 2-b, 3-c
B 1-b, 2-a, 3-c
C 1-a, 2-c, 3-b
D 1-c, 2-b, 3-a
Explanation

The correct matching is: budget provision with Rs. 4,000 crore, physical target with 13,796 km, and completion up to December 2024 with 5,606 km. Assigning Rs. 4,000 crore to the target or 13,796 km to completed work swaps distinct scheme metrics; treating 5,606 km as the budget provision is also a category error.

Q4Match the Rajasthan road-network indicator with its value as of 31 March 2024. List I 1. Total road length 2. Road density List II a. 3,17,121 km b. 92.66 km per 100 sq km c. 3,71,121 km d. 86.92 km per 100 sq km Select the correct code.

A 1-c, 2-b
B 1-a, 2-d
C 1-c, 2-d
D 1-a, 2-b
Explanation

The correct pairing is total road length with 3,17,121 km and road density with 92.66 km per 100 sq km. Pairing road density with 86.92 confuses it with a banking ratio from another indicator. Pairing total road length with 3,71,121 km transposes the digits and is not the Economic Review figure.

Q5Under Viksit Rajasthan vision @2047, one of the ten resolutions in Rajasthan's Modified Budget 2024-25 was to make Rajasthan an economy of which size?

A USD 350 billion economy
B USD 500 billion economy
C USD 400 billion economy
D USD 300 billion economy
Explanation

The cited budget fact specifically names the target as a USD 350 billion economy. The USD 300 billion, USD 400 billion and USD 500 billion figures are close numeric distractors, but they are not the resolution stated in the Modified Budget 2024-25 fact.

You've seen 5 of 31 sample questions

Unlimited practice on Rajasthan Development Planning comes with the RAS Test Series + Practice pack or Gate Pass.

More questions

6With reference to the water works in the December 2024 Jaipur project package, consider the following statements: 1. Foundation stones were included for Ramgarh Barrage and Mahalpur Barrage. 2. The package included transfer of water from Navnera Barrage to Bisalpur and Isarda dams through a Chambal aqueduct. 3. The stated cost of these water works was over Rs. 46,300 crore. 4. The stated cost of these water works was over Rs. 9,400 crore. Which statements are correct?

AStatements 1, 2 and 4 only
BStatements 1, 3 and 4 only
CStatements 2 and 3 only
DStatements 1 and 2 only

7In a chronology of recent water-resource agreements for Rajasthan, which date-event entry is correctly placed for the Modified Parbati-Kalisindh-Chambal Link Project?

A28 January 2024 — Memorandum of Agreement signed among Rajasthan, Madhya Pradesh, and the Government of India
B5 December 2024 — Agreement signed only between Rajasthan and Madhya Pradesh, without the Government of India
C27 March 2025 — Memorandum of Agreement signed among Rajasthan, Madhya Pradesh, and the Government of India
D5 December 2024 — Memorandum of Agreement signed among Rajasthan, Madhya Pradesh, and the Government of India

8With reference to Rajasthan's Modified Budget 2024-25, consider the following statements about the Viksit Rajasthan vision @2047: 1. It set a five-year Amrit Kaalkhand action plan. 2. The action plan was framed with ten resolutions for inclusive growth. 3. The plan was limited to urban infrastructure growth only. Which of the statements given above are correct?

AStatements 2 and 3 only
BStatements 1 and 2 only
CStatements 1 and 3 only
DStatements 1, 2 and 3

9Which information is specifically mentioned as useful for future policy and schemes in the census report?

AOnly daily weather and rainfall data
BEducation, employment, sex ratio and caste-related data
COnly land prices in urban areas
DOnly tourist arrivals at heritage sites

10Assertion (A): Under the State Road Fund in 2024-25, Rajasthan had completed 3,127 km of works up to December 2024. Reason (R): The same State Road Fund entry carried an allocation of Rs. 1,550 crore and a physical target of 5,099 km. Select the correct answer.

AThe Assertion is false, but the Reason is true
BThe Assertion is true, but the Reason is false
CBoth the Assertion and the Reason are true, but the Reason does not correctly explain the Assertion
DBoth the Assertion and the Reason are true, and the Reason correctly explains the Assertion

11With reference to the Modified PKC link project, consider the following statements: 1. It proposes drinking and industrial water for 13 eastern Rajasthan districts. 2. It proposes irrigation of 2.8 lakh hectares or more in Rajasthan. 3. It proposes drinking and industrial water mainly for 13 western Rajasthan districts. Which of the statements given above are correct?

A1 and 2 only
B1 and 3 only
C2 only
D1 only

12For Jal Jeevan Mission in Rajasthan, which sequence correctly presents the connection-progress reporting from the Economic Review: first the reporting cut-off date, then total household tap connections up to that date, then new connections during 2024-25?

A19 February 2025; 59.61 lakh; 8.26 lakh
B3 February 2025; 92 lakh; 8.26 lakh
C3 February 2025; 59.61 lakh; 8.26 lakh
D3 February 2025; 8.26 lakh; 59.61 lakh

13According to the Rajasthan Economic Review 2024-25, which statement correctly describes Rajasthan's banking position up to September 2024?

A8,531 operational bank branches and a credit-deposit ratio of 79.32 percent, equal to the national average
B8,351 operational bank branches and a credit-deposit ratio of 86.92 percent, below the national average of 89.32 percent
C8,531 operational bank branches and a credit-deposit ratio of 76.92 percent, below the national average of 79.32 percent
D8,531 operational bank branches and a credit-deposit ratio of 86.92 percent, above the national average of 79.32 percent

14Match the capacity category with its target under the Rajasthan Integrated Clean Energy Policy, 2024, for 2029-30.

ASolar - 90,000 MW; wind and hybrid - 10,000 MW; hydro, PSP and battery storage - 25,000 MW
BSolar - 10,000 MW; wind and hybrid - 25,000 MW; hydro, PSP and battery storage - 90,000 MW
CSolar - 25,000 MW; wind and hybrid - 90,000 MW; hydro, PSP and battery storage - 10,000 MW
DSolar - 90,000 MW; wind and hybrid - 25,000 MW; hydro, PSP and battery storage - 10,000 MW

15Assertion: Rajasthan Renewable Energy Corporation is the nodal agency for executing the Rajasthan Integrated Clean Energy Policy, 2024. Reason: The nodal role covers project registration, approvals and coordination under the policy. Choose the correct answer.

AThe Assertion is true, but the Reason is false
BBoth the Assertion and the Reason are true, but the Reason does not explain the Assertion
CThe Assertion is false, but the Reason is true
DBoth the Assertion and the Reason are true, and the Reason explains the Assertion