Q1If 12 workers can plant 720 saplings in 6 days, how many saplings can 15 workers plant in 8 days at the same rate?

A 1200 saplings
B 960 saplings
C 1440 saplings
D 1080 saplings
Explanation

The original work is 720 saplings in 12 x 6 = 72 worker-days, so the rate is 10 saplings per worker-day. With 15 workers for 8 days, there are 120 worker-days. Therefore the number of saplings is 120 x 10 = 1200.

Q2A tank is filled by pipe A in 6 hours and by pipe B in 9 hours. If both pipes are opened together, how long will they take to fill the tank?

A 4 hours 30 minutes
B 7 hours 30 minutes
C 3 hours 36 minutes
D 3 hours 12 minutes
Explanation

Pipe A fills 1/6 of the tank per hour and pipe B fills 1/9 per hour. Together they fill 1/6 + 1/9 = 5/18 of the tank each hour. Required time is 18/5 hours = 3.6 hours = 3 hours 36 minutes.

Q3The marked price of a pair of field shoes is Rs 1,200. A discount of 15% is allowed. What is the selling price?

A Rs 1,020
B Rs 1,180
C Rs 980
D Rs 1,080
Explanation

A discount of 15% on Rs 1,200 is 15/100 multiplied by 1,200, equal to Rs 180. The selling price is marked price minus discount, so Rs 1,200 minus Rs 180 gives Rs 1,020. This tests direct use of percentage discount, not profit or tax.

Q4A forest guard records that 28% of the saplings in a nursery are neem. If there are 350 saplings in all, how many saplings are not neem?

A 280
B 252
C 222
D 98
Explanation

Neem saplings are 28% of 350, which is 98. The remaining saplings form 100% - 28% = 72% of the total, and 72% of 350 equals 252.

Q5If 9 workers can clear a trail in 16 days, how many workers are needed to clear the same trail in 12 days, assuming the same work rate?

A 14 workers
B 18 workers
C 12 workers
D 10 workers
Explanation

For a fixed job, workers and days vary inversely. The work equals 9 x 16 = 144 worker-days, so in 12 days the number of workers required is 144 / 12 = 12.

You've seen 5 of 75 sample questions

Unlimited practice on Vanpal General Studies with Special Reference to Rajasthan comes with the RAS Test Series + Practice pack or Gate Pass.

More questions

6The roots of the quadratic equation x^2 - 11x + 30 = 0 are:

A5 and 6
B3 and 10
C2 and 15
D-5 and -6

7A forest guard walks 18 km in 3 hours and then 12 km in 2 hours. What is his average speed for the whole journey?

A7 km/h
B6 km/h
C5 km/h
D6.5 km/h

8A train 180 m long crosses a pole in 12 seconds. What is the speed of the train in km/h?

A54 km/h
B45 km/h
C60 km/h
D72 km/h

9The perimeter of a rectangle is 50 cm. If its length is 5 cm more than its breadth, what is its area?

A200 sq cm
B175 sq cm
C150 sq cm
D125 sq cm

10A team can dig 18 inspection pits in 6 days. Working at the same rate, how many days will the team take to dig 30 such pits?

A15 days
B10 days
C12 days
D8 days

11A rectangular field is 60 m long and 45 m wide. A path of width 3 m is made all around the field inside it. What is the area of the path?

A558 square m
B576 square m
C612 square m
D594 square m

12A bag contains 5 green, 3 red and 2 blue balls. If one ball is drawn at random, what is the probability that it is red?

A3/10
B1/2
C1/5
D7/10

13A shopkeeper marks an article 25% above its cost price and then allows a discount of 12% on the marked price. What is his profit percentage?

A10%
B8%
C12%
D13%

14A rectangular plantation plot is 42 m long and 28 m wide. What will be the cost of fencing it at Rs. 35 per metre?

ARs. 41,160
BRs. 2,450
CRs. 3,920
DRs. 4,900

15A vehicle covers 144 km in 3 hours while carrying saplings. What is its average speed?

A51 km/h
B54 km/h
C48 km/h
D42 km/h