Q1Match List I with List II and select the correctly matched set. List I (Component): 1. Plantation in inaccessible terrain; 2. Oran conservation; 3. Soil-water conservation; 4. Monitoring List II (Measure): a. Drone-based seed dispersal; b. Mapping and restoration through gram panchayats; c. Check dams and recharge tanks; d. Soil-health cards and remote sensing

A 1-b, 2-a, 3-d, 4-c
B 1-a, 2-c, 3-b, 4-d
C 1-d, 2-b, 3-c, 4-a
D 1-a, 2-b, 3-c, 4-d
Explanation

Each pair follows a distinct project provision: drones disperse seeds in inaccessible terrain; gram panchayats support Oran mapping and restoration; check dams and recharge tanks conserve soil moisture and water; and soil-health cards with remote sensing support monitoring. Thus 1-a, 2-b, 3-c and 4-d is correct.

Q2Consider the following statements about the Green Aravali Development Project: 1. The Forest Department guidelines map the Aravalli landscape across 19 Rajasthan districts. 2. The possible treatment area for 2024-25 to 2028-29 is 1,48,859 hectares, subject to budget availability. 3. The project is an individual cash-benefit scheme. Which of the statements given above are correct?

A 1 only
B 2 and 3 only
C 1 and 2 only
D 1, 2 and 3
Explanation

Statements 1 and 2 reproduce the guideline facts: coverage spans 19 Rajasthan districts and the possible 2024-25 to 2028-29 treatment area is 1,48,859 hectares, subject to funds. Statement 3 is false because the project restores a landscape and does not transfer cash to individuals.

Q3Which description best identifies the Green Aravali Development Project?

A A direct cash-transfer scheme for farmers living near the Aravalli range
B A state landscape-restoration project combining afforestation, soil-water conservation and biodiversity protection
C An urban housing programme limited to Jaipur and Udaipur
D A tourism subsidy for private resorts in hill districts
Explanation

The project restores the Aravalli landscape through afforestation, soil and moisture conservation, biodiversity protection and climate-resilience measures. It is a public ecological-restoration programme rather than a cash-transfer, housing or tourism-subsidy scheme.

Q4What was the budget provision announced for the Green Aravali Development Project in the Rajasthan Budget 2025-26?

A ₹250 crore
B ₹100 crore
C ₹150 crore
D ₹500 crore
Explanation

The Rajasthan Budget 2025-26 listed the Green Aravali Development Project with a specific provision of ₹250 crore. The ₹100 crore and ₹150 crore figures belong to other Green Budget initiatives, so option A alone matches the project allocation.

Q5Which year had the largest planned treatment area in the year-wise schedule for 2024-25 to 2028-29?

A 2026-27, about 39,453 hectares
B 2024-25, about 36,261 hectares
C 2025-26, about 32,241 hectares
D 2028-29, about 20,900 hectares
Explanation

The schedule assigns about 39,453 hectares to 2026-27. This exceeds 36,261 hectares in 2024-25, 32,241 hectares in 2025-26, 20,004 hectares in 2027-28 and 20,900 hectares in 2028-29, making 2026-27 the peak year.