Green Aravali Development Project MCQ - Practice Questions with Answers
Solve 5 Green Aravali Development Project questions for RAS/RPSC preparation.
Practice questions
Q1Match List I with List II and select the correctly matched set. List I (Component): 1. Plantation in inaccessible terrain; 2. Oran conservation; 3. Soil-water conservation; 4. Monitoring List II (Measure): a. Drone-based seed dispersal; b. Mapping and restoration through gram panchayats; c. Check dams and recharge tanks; d. Soil-health cards and remote sensing
Each pair follows a distinct project provision: drones disperse seeds in inaccessible terrain; gram panchayats support Oran mapping and restoration; check dams and recharge tanks conserve soil moisture and water; and soil-health cards with remote sensing support monitoring. Thus 1-a, 2-b, 3-c and 4-d is correct.
Q2Consider the following statements about the Green Aravali Development Project: 1. The Forest Department guidelines map the Aravalli landscape across 19 Rajasthan districts. 2. The possible treatment area for 2024-25 to 2028-29 is 1,48,859 hectares, subject to budget availability. 3. The project is an individual cash-benefit scheme. Which of the statements given above are correct?
Statements 1 and 2 reproduce the guideline facts: coverage spans 19 Rajasthan districts and the possible 2024-25 to 2028-29 treatment area is 1,48,859 hectares, subject to funds. Statement 3 is false because the project restores a landscape and does not transfer cash to individuals.
Q3Which description best identifies the Green Aravali Development Project?
The project restores the Aravalli landscape through afforestation, soil and moisture conservation, biodiversity protection and climate-resilience measures. It is a public ecological-restoration programme rather than a cash-transfer, housing or tourism-subsidy scheme.
Q4What was the budget provision announced for the Green Aravali Development Project in the Rajasthan Budget 2025-26?
The Rajasthan Budget 2025-26 listed the Green Aravali Development Project with a specific provision of ₹250 crore. The ₹100 crore and ₹150 crore figures belong to other Green Budget initiatives, so option A alone matches the project allocation.
Q5Which year had the largest planned treatment area in the year-wise schedule for 2024-25 to 2028-29?
The schedule assigns about 39,453 hectares to 2026-27. This exceeds 36,261 hectares in 2024-25, 32,241 hectares in 2025-26, 20,004 hectares in 2027-28 and 20,900 hectares in 2028-29, making 2026-27 the peak year.