Q1Assertion (A): In Rajasthan, renewable-energy success depends not only on adding solar and wind capacity but also on transmission and storage. Reason (R): Desert renewable projects are often far from major load centres, and solar output does not automatically meet evening demand. Choose the correct answer.
Rajasthan's renewable lead is connected with the grid. Solar and wind resources are concentrated in western desert districts, while major consumption is in cities, industrial belts, agriculture feeders and wider load centres. They also note that solar generation is strong in the day, while demand continues into the evening. This is why transmission corridors, substations, battery storage, pumped storage and flexible grid planning are part of the energy frame. The reason therefore directly explains the assertion.
Q2Match List I with List II in Rajasthan's electricity-sector structure: List I: 1. RVUNL 2. RVPNL 3. Jaipur, Ajmer and Jodhpur discoms 4. Rajasthan Electricity Regulatory Commission List II: a. Distribution and consumer supply b. Tariff and sector regulation c. State generation d. Bulk transmission Choose the correct code.
Rajasthan's power sector through the flow of electricity after the 2000 unbundling is organised. RVUNL is linked with State generation, RVPNL carries bulk power through high-voltage transmission, and the Jaipur, Ajmer and Jodhpur discoms handle distribution and consumer supply. The Rajasthan Electricity Regulatory Commission is separate from these operating companies and deals with tariffs, licences, consumer interests and sector rules. The correct matching is therefore generation, transmission, distribution and regulation in that order.
Q3Which pairing is correctly matched for Rajasthan's power sector?
Rawatbhata in Chittorgarh district is marked as Rajasthan's nuclear-energy anchor. They also warn against common pair-confusion: Bhadla belongs to solar power, Barsingsar and Giral are linked with lignite power, and Chambal-Mahi projects are associated with hydel and multipurpose river-valley development. Therefore, the cleanly matched source-place pair is Rawatbhata with nuclear power. The other pairings shift well-known Rajasthan energy locations into the wrong source category.
Q4Which statement correctly describes Bhadla Solar Park in Rajasthan's energy geography?
Bhadla Solar Park is identified as the flagship example of Rajasthan's solar power. Its importance comes from the Thar Desert belt's high sunlight, open land and transmission-linked solar-park model. The capacity given is 2,245 MW. Lignite power is linked with examples such as Barsingsar and Giral, hydel power with river-valley projects such as Chambal and Mahi, and nuclear power with Rawatbhata. Therefore the description that joins Bhadla with solar power, the Thar Desert belt and 2,245 MW is the defensible answer.
Q5Consider the following statements about Rajasthan's renewable-energy planning: Statement 1: Solar power is the headline resource, but wind, storage and transmission are needed to make the renewable system more reliable. Statement 2: Solar-wind hybrid projects can use land and evacuation infrastructure more efficiently because solar and wind peaks do not always coincide. Which of the statements is/are correct?
Rajasthan's renewable story is not treated as solar capacity alone. Solar is the headline because of high radiation and desert land, but the system also needs wind, storage, demand management and transmission. Hybrid projects matter because solar and wind generation peaks do not always occur at the same time, so the same land and evacuation corridor can carry useful power across more hours of the day. Therefore, both statements state the planning logic accurately.
You've seen 5 of 19 sample questions
Unlimited practice on Energy resources and power sector of Rajasthan comes with the RAS Test Series + Practice pack or Gate Pass.
More questions
6Which one of the following statements is incorrect about Rajasthan's 2024 clean-energy planning frame?
7Match the Rajasthan power-sector institution with its main function: List I: 1. RVUNL 2. RVPNL 3. Jaipur, Ajmer and Jodhpur discoms 4. RERC List II: a. Regulates tariffs and service standards b. Handles State power generation c. Carries bulk power through high-voltage transmission lines d. Distributes electricity to consumers Which matching is correct?
8Statement 1: Rajasthan's present electricity structure came from separating generation, transmission and distribution after the State Electricity Board was unbundled in 2000. Statement 2: The Jaipur, Ajmer and Jodhpur Vidyut Vitran Nigams are transmission companies that carry bulk power through high-voltage lines. Which of the statements is/are correct?
9Which statement best captures the exam-relevant significance of Bhadla Solar Park in Rajasthan's power sector?
10Which pair is correctly matched for Rajasthan's conventional energy resources?
11Assertion (A): High solar capacity in Rajasthan does not automatically mean round-the-clock consumer supply. Reason (R): Solar generation is strongest during sunshine hours, and reliable supply also depends on transmission, storage, forecasting, backup and distribution.
12Consider the following statements about wind, biomass and clean-energy planning in Rajasthan. Statement 1: Wind power potential is associated with western and south-western belts such as Jaisalmer, Barmer, Jodhpur and parts of Pali and Ajmer. Statement 2: Biomass energy is linked with local resources such as agricultural residue, mustard stalk, cattle-linked biomass and municipal waste. Statement 3: Green hydrogen is described as a daily household cooking fuel already used across Rajasthan. Which statements are correct?
13Consider the following statements about Bhadla Solar Park: Statement 1: It is associated with the Thar Desert belt and is Rajasthan's flagship solar project. Statement 2: Its capacity is stated as 2,245 MW. Which of the statements is/are correct?
14Match the power-sector item with its correct function or association. List I: 1. RVUNL 2. RVPNL 3. Distribution companies 4. Rawatbhata List II: a. Consumer supply and billing b. State power generation c. Nuclear power anchor d. High-voltage transmission Choose the correct code.
15Which description best captures why Bhadla Solar Park is treated as Rajasthan's flagship solar asset in this topic?